Renovations were made to this existing 14,000 sf broadcast facility with very technical project requirements. The electrical power, technical system interconnections, and HVAC discharge were facilitated through raised access floor system. This was the first time in Colorado that this system was utilized. The large amount of equipment, conduit, pedestals, ducting, and fire alarms systems below the access floor required extensive layout and coordination. Numerous redesign changes were implemented to meet the project requirements without jeopardizing the schedule. The project was completed in an occupied Class A office building.

PROJECT DETAILS

Client

Hallmark Entertainment

Location

Greenwood Village, CO

Size

14,000 sf

Value

$6 million

Market

Advanced Technology

Architect

CannonDesign